ESP Overhaul & Maintenance Work
Comprehensive overhaul and maintenance of one unit of Electrostatic Precipitator (ESP), including electrical testing, equipment replacement, and relay protection system upgrades.
- Boiler Type: Circulating Fluidized Bed (CFB) Boiler
- Boiler Capacity: 75 Ton/hr
- Operating Pressure: 100 BarG
- Steam Temperature: 550°C
- Turbine Type: Back Pressure Steam Turbine
- Power Output: 9.9 MWe
Scope of Work (SOW)
-
Electrical inspection and testing:
-
Transformer oil resistance checking
-
DC Bus voltage measurement
-
Relay testing:
-
27/59 UV (Under/Over Voltage)
-
50/51 OCR (Overcurrent Protection)
-
50N (Earth Fault)
-
81 (Frequency Relay)
-
-
-
Replacement and installation:
-
Circuit Breaker replacement for electrical panel
-
ESP Hopper Knocking Actuator replacement
-
Short Circuit Relay installation
-
Project Value
1.97 Million THB
Project Duration
17 March – 6 April 2023